Evaluation Study of Electric Submersible Pump (ESP) IND-1000 Pump Model with Analysis of the Flow Rate of Crude Oil in Production Well
Abstract
Keywords
Full Text:
PDFReferences
Ahuluheluw, J., Massolo, L. D., & Nugraha, P. (2020). Sensitivitas Jumlah Stages pada Desain ESP Sumur Directional “ X ” Lapangan Salawati. INTAN Jurnal Penelitian Tambang, 3(1), 14–19.
Guo, B., Liu, X., & Tan, X. (2017). Petroleum Production Engineering Petroleum Production Engineering (2nd ed.). Gulf Professional Publishing.
Jaya, P., Rahman, A., & Herlina, W. (2014). Evaluasi Pompa Electric Submersible Pump (ESP) Untuk Optimasi Produksi pada Sumur P-028 dan P-029 di PT. PERTAMINA EP Asset 2 Pendopo Field Evaluation Electric Submersible Pump (ESP) For Optimzation Production at the Well P-028 and P-029 PT . PERTAMINA. Jurnal Ilmu Teknik, 2(4).
Jayanti, P. D., Sudibyo, R., & Sulustiyanto, D. (2015). Evaluasi dan Optimasi pompa Electric Submersible Pump (ESP) Pada Sumur-sumur di Lapangan X. Seminar Nasional Cendekiawan, 376–386.
Nataliana, D., Taryana, N., & Akbar, R. A. (2018). Studi Korelasi antara Kapasitas Daya Motor Electrical Submersible Pump terhadap 4 Parameter Sumur Minyak. ELKOMIKA, 6(1), 79–96.
Pranondo, D., Sobli, T. C., Studi, P., Eksplorasi, T., Migas, P., & Akamigas, P. (2020). Analisis sumur dengan inflow performance relationship metode vogel serta evaluasi tubing menggunakan analisis nodal pada sumur tcs. Jurnal Teknik Patra Akademika, 11(02), 33–42.
PT. Epsindo Jaya Pratama. (2006). Product Catalog: Electric Submersible Pumping System Development & Manufacturing Made in Indonesia.
Sari, D. A., Soepryanto, A., & Burhanuddin, S. (2016). Re-Design Electric Submersible Pump Pada PT Chevron Pacific Indonesia – Minas Pekanbau. Jurnal Ilmu Dan Aplikasi Teknik, 1(1), 25–33.
Sugiharto, A. (2012). Optimasi Produksi Lapangan Minyak Menggunakan Metode Artificial Lift Dengan ESP Pada Lapangan Terintegrasi. Swara Patra, 02(1), 1–14.
Takacs, G. (2007). Installing Successful ESPS Through Effective Design And Analysis Conducted. IQPC: International Quality & Productivity Centre.
Wahono, P. A., Komar, S., & Suwardi, F. R. (2015). Evaluasi Pompa ESP Terpasang untuk Optimasi Produksi Minyak PT . PERTAMINA Asset I Field Ramba. 21(1).
DOI: http://dx.doi.org/10.31958/js.v14i2.7124
Refbacks
Copyright (c) 2022 Isnani Agriandita, Abdul Kamid
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Indexed by:
__________________________________________________________________________
Sainstek: Jurnal Sains dan Teknologi
ISSN 2085-8019 (print) | 2580-278x (online)
Published by Institut Agama Islam Negeri Batusangkar
Email: sainstek@iainbatusangkar.ac.id
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.